Home/Opportunities/Design and Construction of Beechworth WWTP Upgrade
Tender

Design and Construction of Beechworth WWTP Upgrade

Overview

North East Water has completed a preliminary design for the upgrade of Beechworth Wastewater Treatment Plant (WWTP) and obtained a development license from the EPA. It is now seeking to engage a Principal Contractor under a design and construct contract to deliver the works. The Beechworth WWTP located on McFeeters Road is to be upgraded from a lagoon-based treatment process to a biological nutrient removal plant from which treated water will continue to flow to a nearby waterway or be used for onsite irrigation. The scope of works will include new concrete bioreactors and associated equipment, inlet works, UV system and outfall pipework, sludge thickener, aerobic digester, sludge dewatering unit, electrical and control systems, connection to existing assets at key interface points, and refurbishing an existing lagoon for flow/load buffering.

Key Information

Provider
Victorian Government
Government
Opening Date
January 1, 2026
Agency
North East Regional Water Corporation
Location
Beechworth, Victoria, Australia
Reference Number
PR22008-01
Country
AustraliaAustralia

Details

Eligibility Criteria
  • Tenderer Authorization
    The person lodging the Tender must be duly authorized to lodge the Tender on behalf of the Tenderer and bind the Tenderer unconditionally by the offer set out in the Tender.
  • Compliance with Tender Conditions
    Tenderers must comply with all Conditions of Tender and submit all information fields in Part D completed with accurate and complete information.
  • Financial Viability
    Tenderers must demonstrate financial capacity to provide all contract requirements over the term of the contract and provide requested financial information upon North East Water's request.
  • Insurance Compliance
    Tenderers must comply fully with minimum insurance types and levels required by the RfT documentation and provide evidence such as certificates of currency.
  • Conflict of Interest
    Tenderers must declare any actual, potential or perceived conflicts of interest and have processes to manage them.
Deliverables
  • Design documentation including process, civil, mechanical, electrical and structural assessments
  • Construction of new wastewater treatment assets
  • Refurbishment of Primary Lagoon 2
  • Integration with existing infrastructure
  • Decommissioning of redundant assets and removal of residuals
  • Proof of performance testing and monitoring during Defects Liability Period
  • Submission of all required documentation and approvals
  • Stakeholder and customer engagement plans
  • Occupational health and safety compliance
  • Environmental, climate and heritage management plans
  • Commissioning, verification, and start-up activities
  • Training of operators
Evaluation Criteria
Compliance with Tender Requirements

Assessment of completeness and compliance with Conditions of Tender, Specification, and Proposed Contract.

Technical Capability and Methodology

Evaluation of design and construction methodology, technical solution, risk management, and innovation.

Business Capability and Industry Knowledge

Assessment of organisational experience, public sector experience, and relevant project examples.

Financial Viability and Insurance

Evaluation of financial capacity and insurance compliance.

Value for Money

Assessment of lump sum price and cost breakdown structure.

Stakeholder and Customer Engagement

Evaluation of stakeholder management plans and customer service approach.

How to Apply
Method
Electronic submission as per Part D instructions
Contact
North East Water Privacy Officer, info@newater.com.au, 1300 361 622
Conditions & Exclusions
  • Tenderers must not engage in collusive pricing or anti-competitive practices.
  • Tender submissions must not include promotional materials or graphics except as permitted at the end of documents.
  • Tenderers must fully comply with the Proposed Contract terms or clearly state non-compliance.
  • Incomplete or non-compliant tenders may be rejected at North East Water's discretion.

Supporting Documents

pr22008-01_-_part_d_-_tenderers_response.docx
184.1 KB
Download
pr22008-01_-_part_d_-_attachment_1_-_key_personell.xlsx
12.4 KB
Download

Sign in to download documents

Chat with Documents

AI Preview
Ask questions about this opportunity

Sign in to chat with grant documents and get instant answers

Similar Opportunities

Track This Opportunity

Sign up to get deadline reminders, save opportunities, and manage your applications in one place.

Start Free TrialSign In
Smart Matching
Get personalized recommendations
Deadline Alerts
Never miss a submission date
AI Grant Brief

AI-extracted purpose, eligibility, key dates and submission requirements.

Sign In to View Brief
Profile Match

See how well your organisation matches this opportunity's requirements.

Sign In to See Match
Bid Plan

AI-generated proposal writing guide with win themes, timeline and risk register.

Sign In to Generate Plan
Success Analysis

Predict your likelihood of winning with an AI-powered success score and recommendations.

Sign In to View Score